BRISTOL, Tenn. — The instant the

Swift said pouring concrete walls takes time — and then more time to cure properly.

“As soon as the last pitch is thrown, the last hit’s hit, teams do their thing, postgame’s taken care of, pads will start coming off the wall, and they’ll work through the night to basically start disassembling so we can reassemble for the NASCAR race,” Swift said.

Some of the gravel will be used in Bristol’s parking lots. Swift said they have found groups to help use some of the materials to help people still recovering from the damages left by Hurricane Helene. That includes 2x4s and plywood used for the grandstands.

“A lot of stuff is going to go to good use as far as the rebuild portion,” Swift said. “We just need to get it out of the way so we can put back asphalt and concrete.”

This new renovation schedule has a couple of days built in for protection. The target date for being finished is Sept. 7.

“There may still be some paint drying whenever they roll in with the Goodyear haulers, but we’ll definitely shoot for (Sept. 7),” Swift said.

Bristol hosted a college football game in 2016 that drew 156,990. Now the NHL might be in Bristol’s future after Sportico reported Friday that league officials would be checking out how the racetrack handled Major League Baseball.

“We’ve shown with football and now baseball being here, that things can take place and we can do the things that nobody would even think about,” Swift said.